At the beginning is always the idea, the desire and / or the dream. Some also say: At the top is the vision. When we had the house before purchasing perspective, we knew that a lot of work ahead of us would, but with so much space was all the more space for your own dreams and visions. All rooms should be large turn out, was finally enough space everywhere!
In addition to the bedrooms, a private bathroom for us, the idea was unanimously "eingelocht". First of all, we have the door in the hallway walled up, but should only a receipt for the bathroom available, and that even if only on the bedroom pails. Then had a breakthrough in the mistaken thick walls can be made:
Once that's done, it should go in the bathroom. So many ideas were in place and was enough-we just laid off.
With ebay, we had had a nice hot tub at a price of only 690 euros (plus shipping) ersteigert and this should be a respectable place. A podium had her bath and the same it:
The walls had to be cleaned and the pipes had to be relocated
The water pipes and floor heating and insulation had
incorporation
The door had angepuzt breakthrough, so that everything looks right now smooth
Due to the weight we have decided to Dry Streak to use and has been the ground with a yield prepared
Neo and Meike give tips
After the extent of soil was prepared, it was necessary to cover the walls
The outer walls were completely insulated. While the walls are already 70cm thick but we have added another Styropordämmug
Since the bathroom about 40qm, the shower should also be something unusual. So Ytong Stones (Yes, there were Ytong
) Brought to the ground and on paper and staring losgelegt
If everything works for the tiles was prepared, I wanted to first finish the shower.
Louis helped where he could
While I worked at the large flights have made it the small wings ever before
The shower should not only in the form of the entire Bath fly, but also through the tiles and the color accents in the bathroom set
This is the shower after the completion of
For the ground as well as for the walls, we have deliberately used large tiles
in the bathtub, we have the podium with wood and occupied us for a fancy toilet decided
The sink should be made on a large table arranged and a urinal was never missing. Damti the mirror will have noticed something one tip (as well as the bathtub) tiled. The mirrors were incidentally in a cloakroom for Sale
Under the sink, we left a car radio and in the ceiling, then two good car speakers fitted. The ceiling, we have made Vertäfelung blue and the walls of the marble tiles with a color coated.
Now, missing only the sky over shower and bathtub.
The bathroom has many high-quality materials but was in the low-budget area. You only have ideas, then you can also useful material with a great atmosphere.
Stay tuned


